Sheet metal scope, measured component by component

Ductwork Estimating & Takeoff ServicesHVAC estimating services, 24–48 hour turnaround

Ductwork quantities and estimating support for sheet metal contractors, mechanical subcontractors and fabricators. Keep straight runs, fittings, accessories and insulation visible.

Bidding a US HVAC project? Send the mechanical plans, project location and bid deadline. Confirm whether you need quantities only, a priced estimate or bid support before work begins.

For most estimates, a ductwork takeoff typically costs $150 to $1,000. That moves with project size and scope, and delivery is typically 24–48 hours.

Share the air-distribution sheets and the bid date. Most estimates are typically priced between $150 and $1,000 once size and scope are known, typically within 24–48 hours.

Request Ductwork Estimating & Takeoff Services

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    When to request ductwork estimating & takeoff services

    Use this scope for sheet-metal purchasing, fabrication pricing or installation bids. Decide whether your team needs installed quantities, purchasing quantities, shop labor, field labor or a complete combination; each answers a different question.

    What is counted

    These are the items a quote for ductwork estimating & takeoff services can include. The accepted quote is the list that gets counted. Confirm the systems, drawing set, and requested output before work starts.

    • Rectangular, round, spiral, oval and flexible duct runs
    • Elbows, transitions, offsets, branches, end caps and connections
    • Fire/smoke dampers, access doors, turning vanes and flexible connectors
    • External duct wrap and internal liner as separate scope
    • Shop fabrication and field installation labor when pricing is requested

    CSI MasterFormat division

    Sheet-metal scope sits in CSI MasterFormat Division 23 air distribution. Insulation on the duct is a different section from the metal itself.

    • 23 31 00 HVAC Ducts and Casings
    • 23 33 00 Air Duct Accessories, including dampers and access doors specified there
    • 23 37 00 Air Outlets and Inlets
    • 23 07 13 Duct Insulation, when wrap or liner is part of the request

    Software used in the industry

    Estimators in this trade commonly measure duct on PlanSwift, Bluebeam, or a sheet-metal tool such as FastDUCT. Naming a program describes how mechanical estimators often measure or calculate. It is not a statement that this desk licenses, resells, or requires that product. Send PDFs. The quote states the file you will receive.

    Documents and inputs for your quote

    InputWhy it matters
    Duct layouts, sections and risersIdentify route lengths, vertical offsets and system separation.
    Duct construction specificationConfirm material, gauge or thickness, pressure class and joint construction.
    Fitting and equipment detailsCount transitions, taps, connectors, access doors and curbs at interfaces.
    Insulation and liner schedulesSeparate bare duct area, external wrap and internal acoustic liner.

    How the quantities and assumptions are developed

    Ductwork should be grouped by size, material, gauge, pressure class and joining method specified for the project. A straight galvanized run and a welded stainless exhaust assembly need different pricing and productivity assumptions. Do not select a gauge merely from a generic table when project specifications set the construction requirements.

    For a rectangular straight run, gross perimeter area equals 2 × (width + height) × length when dimensions use the same units. A 24 × 12 inch duct, 20 feet long, has 120 square feet of perimeter area before seams, fitting surfaces, overlaps or scrap. Converting this to purchasing weight requires the specified material thickness and density.

    Illustrative example

    Illustrative straight duct versus purchasing area

    For a 24 × 12 inch rectangular main 20 feet long, convert the cross-section to 2 × 1 feet before calculating the perimeter area.

    CalculationResultMeaning
    2 × (2 + 1) × 20120 SFGross straight-run perimeter area.
    120 SF × assumed 1.10 factor132 SFIllustrates a 10% purchasing allowance only.
    Three branches × 10 LF30 LFBranch lengths remain in their own size group.
    Elbows and transitionsCount separatelyTheir surfaces are not established by the main-run calculation.

    A 10% factor is an arithmetic illustration, not a standard waste recommendation. Weight requires the specified thickness and material density; the fitting and fabrication basis must be stated separately.

    Checks before you use the estimate

    • Separate supply, return, exhaust and outside-air duct before assigning construction and insulation.
    • Keep rectangular, round, oval and flexible duct in distinct size groups.
    • State whether length is centerline, installed straight length or another agreed measurement convention.
    • Separate net sheet area from seam, reinforcement, fitting surface and scrap allowances.
    Need estimating support for an upcoming HVAC bid?

    Most estimates for sheet-metal quantities typically cost $150–$1,000 per estimate. Project size and scope explain the spread, and turnaround is typically 24–48 hours.

    Request HVAC estimating quote

    Deliverables for contractor review

    Specify an editable quantity or cost schedule, drawing references, equipment tags and a scope clarification log. Marked-up drawings connect measured items to the source plans. A priced estimate should identify unit prices, labor hours, rate assumptions and allowances separately.

    Keep the estimate revision and drawing/addendum dates together. Review the illustrative schedules, document register and revision log for the format, and the estimating methodology for measurement, pricing and review steps.

    Inspect recorded mechanical quantities

    Open the real HVAC takeoff excerpts to inspect selected equipment, ductwork and insulation quantities with units and drawing references. The interactive workspace separates base quantities from recorded allowances and includes matched floor and roof drawing excerpts where available. These excerpts demonstrate selected mechanical output; they are not a complete priced bid or a case study for every specialist scope.

    Scope boundaries and exclusions

    Fabrication drawings, engineered duct sizing, installation and guaranteed inspection outcomes are outside a quantity takeoff. Fitting surface areas and fabrication allowances must be documented separately from this straight-run example.

    From plans to a reviewable file

    1. Send the plans

      Include mechanical drawings, schedules, specifications, addenda, the project location, and the bid deadline.

    2. Confirm the quote

      Agree the systems to count, whether the file is quantities or a priced estimate, the fee, and the delivery date before work starts.

    3. Count the Division 23 scope

      Quantities are listed by system with units and drawing references. Open questions stay in a clarification log.

    4. Review before you bid

      Check the workbook and any agreed markups. Your company submits the proposal.

    Fee, delivery and revisions

    Send your project location, document set and bid deadline. Confirm quantities-only, priced estimating, proposal support or a separate calculation package. Agree the fee, deliverables and delivery date before work begins. When documents change, identify the previous and revised issues and confirm the affected scope.

    Agree straight duct, fittings and air devices before work starts. Most estimates typically sit at $150–$1,000 because project size and scope differ, and most are typically returned in 24–48 hours.

    Pricing lists what changes the fee: project size, the mechanical systems on the set, and plan quality. Sample estimates includes redacted Excel takeoffs and color-coded PDF markups.

    Plan your request

    • Project address and building type
    • Drawing and addendum dates
    • Systems and trade boundaries
    • Supplier quotes or contractor rates
    • Bid deadline and required format
    Request this scope

    Inspect real sample quantities →

    Common questions

    Ductwork Estimating & Takeoff Services: technical questions

    Do you report ductwork in linear feet, square feet or pounds?

    Agree the required output. Linear feet describe runs by size; surface area supports sheet-metal and insulation measurement; weight also needs the specified thickness and material density. These units are related but not interchangeable.

    Are shop fabrication and field installation labor separated?

    Request separate shop and field labor if both are needed. Joint construction, fittings, reinforcement, installation height and access can affect the two activities differently.

    How is duct gauge selected?

    Use the issued construction specification and applicable project details. Missing gauge or pressure-class information should be clarified rather than silently replaced with a generic assumption.

    How do you handle waste and seams?

    Show the net quantity first, then identify the agreed seam, overlap, fitting or purchasing allowance. Do not treat one unexplained percentage as a substitute for all fabrication requirements.

    Can you quantify stainless exhaust or kitchen ductwork?

    Submit the material, joining, pressure and testing specifications for a scope review. Specialist fabrication, welding and testing require their own quantities and pricing basis.

    How much does an estimate cost?

    Most ductwork estimates typically cost $150–$1,000. The amount depends on project size and scope and is the desk fee, separate from the sheet-metal install price.

    How fast?

    Most ductwork estimates are typically turned around in 24–48 hours. The date on the accepted quote is the one that applies.