How should a Dallas rooftop bid be broken up?
Most DFW office and flex buildings put packaged rooftop units on a large roof and variable-air-volume boxes in the ceiling. The takeoff has three quantity families. First, the rooftop unit itself: tag, cooling and heating capacity as scheduled, curb, and any specified hail guard or economizer. Second, the medium-pressure duct from the unit to the VAV boxes, including fittings and volume control at the box. Third, the low-pressure duct, flex runouts and diffusers downstream of each box.
A warehouse attached to that office is a different family. Unit heaters, destratification fans, makeup air and toilet exhaust do not belong in the VAV extension. If the roof plan shows both, give them separate subtotals so purchasing can buy packaged equipment without mixing it into sheet-metal pounds.
Sample Dallas office-versus-warehouse rows
| Scope row | Unit | Review note |
|---|---|---|
| RTU-4, office pack, scheduled tons and heating type | EA | Confirm gas versus electric heat on the schedule before anyone prices a flue or an electric coil. |
| VAV box with hot-water coil, tag series | EA | Count boxes from the schedule and tick them off on the plan. A box shown only on the plan is an open item. |
| Medium-pressure rectangular duct upstream of VAV | LB or LF, as agreed | State the unit. Pounds and linear feet are not interchangeable. |
| Warehouse gas unit heater | EA | Include the specified mounting height only as a labor note, not as extra equipment. |
| Office diffuser, 24 x 24 lay-in | EA | Match the neck size. Do not substitute a count of lights or ceiling tiles. |
Shell, tenant, and the second-floor addendum
DFW shell drawings often stop the duct at a capped shaft. The tenant set continues it. If both sets are in the folder, mark which issue is the base bid. Alternates for a future tenant should be a separate column so the shell number can still be submitted.
Controls are the other common gap. A VAV schedule may list a controller that the controls contractor owns. Leave the controller out of the mechanical extension unless your bid form says you carry it, and write that decision on the clarification log.
Pricing inputs that actually change a Dallas number
Ask for the contractor’s sheet-metal labor, the rooftop-unit quote with curb and freight, and whether crane day is in this contract. Summer roof work can change crew hours, but that is a labor assumption you supply, not a quantity the drawings contain. Confirm the authority having jurisdiction from the cover sheet rather than from the word Dallas, because a site in a suburb may use a different review office.