Where do San Antonio renovation drawings hide scope?
Campus and hotel renovations draw new work in bold and existing work screened back. The expensive mistakes are at the tie-in. A new branch duct that connects to an existing corridor main needs a fitting and a damper, not a full re-measure of the corridor. A new pump on an existing chilled-water loop needs nozzles, valves and a shutdown note, not a new loop length from the central plant to the building.
Demolition quantities belong in their own column when the mechanical contractor owns removal. Ceiling devices, old fan-coil units and abandoned duct that must come out are counts, not lengths of new sheet metal.
Sample rows for a San Antonio occupied renovation
| Work | Unit | Column |
|---|---|---|
| New air handler in a mechanical room, tag AHU-N1 | EA | New equipment, including the scheduled coil and filter class. |
| New supply duct from AHU-N1 to the shaft | LF | New sheet metal only. |
| Tie-in to existing 24 x 12 corridor main | EA | One connection, plus the specified access door if drawn. |
| Guest-room PTAC or fan-coil, typical room type A | EA | Quantity from the room schedule, not from a single enlarged plan. |
| Kitchen hood exhaust riser, type I if specified | LF | Separate from guest-room toilet exhaust. Material follows the spec, not the comfort-duct gauge. |
Hot-climate DX versus a campus loop
Some San Antonio buildings are packaged DX. Others sit on a campus chilled-water loop. The drawings tell you which. A DX project needs condensing units, refrigerant piping and housekeeping pads. A loop project needs control valves, coils and maybe a bridge across an existing header. Bidding one as the other is a scope error, not a small quantity error.
Phasing plans matter more than the city. If wing A must stay in service while wing B is replaced, temporary cooling and after-hours labor are cost allowances you either include with a defined hour budget or exclude. They are not guessed from the floor area.
Quote inputs
Send demolition plans, new-work plans, phasing notes, equipment schedules and the specification section that assigns controls and test-and-balance. Identify whether the bid is the whole campus or one building. A building number in the title block is the scope boundary until you say otherwise.