Quantities you can trace back to the drawings

HVAC Takeoff ServicesHVAC estimating services, 24–48 hour turnaround

HVAC takeoff services for mechanical contractors: Division 23 quantities by system, floor, drawing reference and equipment tag. Separate measurement from bid pricing—or hire priced estimator support.

Bidding a US HVAC project? Send the mechanical plans, project location and bid deadline. Confirm whether you need quantities only, a priced estimate or bid support before work begins.

Quantity takeoffs, for most estimates, typically cost $150–$1,000. Project size and scope set that fee, and the work is typically delivered in 24–48 hours.

Send the sheet list and bid deadline. Most estimates typically fall from $150 to $1,000 as project size and scope change, and are typically back in 24–48 hours.

Request HVAC Takeoff Services

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    When to request hvac takeoff services

    Choose quantities-only when your purchasing team already has vendor coverage and your estimator wants to apply company labor units. Ask for a priced estimate when you also need rates and cost extensions; request bid preparation when the final proposal and commercial qualifications are part of the assignment.

    What is counted

    These are the items a quote for hvac takeoff services can include. The accepted quote is the list that gets counted. Confirm the systems, drawing set, and requested output before work starts.

    • Ductwork by shape, size, specification and measured length
    • Fittings, dampers, grilles, diffusers and terminal units
    • HVAC equipment matched to plan tags and schedules
    • Hydronic and refrigerant pipe lengths, valves and supports
    • Insulation measured by service and specified thickness

    CSI MasterFormat division

    Counted quantities are filed as CSI MasterFormat Division 23, Heating, Ventilating, and Air Conditioning. The sections below are the usual homes for the items in the list. A spec that uses a different number is followed as written.

    • 23 05 00 Common Work Results for HVAC, including general requirements the spec places there
    • 23 05 93 Testing, Adjusting, and Balancing for HVAC, listed as a responsibility check rather than an automatic count
    • 23 07 00 HVAC Insulation
    • 23 21 00 Hydronic Piping and Pumps
    • 23 23 00 Refrigerant Piping
    • 23 31 00 HVAC Ducts and Casings
    • 23 33 00 Air Duct Accessories
    • 23 36 00 Air Terminal Units
    • 23 37 00 Air Outlets and Inlets
    • 23 70 00 Central HVAC Equipment and 23 80 00 Decentralized HVAC Equipment, when those units are scheduled

    Software used in the industry

    PlanSwift and Bluebeam are widely used in the industry to measure mechanical PDFs. FastDUCT and FastPIPE are common when a shop separates sheet metal from hydronic pipe. Naming a program describes how mechanical estimators often measure or calculate. It is not a statement that this desk licenses, resells, or requires that product. Send PDFs. The quote states the file you will receive.

    Documents and inputs for your quote

    InputWhy it matters
    Mechanical floor plans and risersTrace horizontal and vertical runs; identify each system and floor.
    Equipment and air-device schedulesReconcile tags, accessory notes and quantities against the plans.
    Specifications, details and addendaIdentify material, pressure class, insulation and changed scope.
    Your report structureAgree units, cost codes, equipment tags, floors and drawing references before measuring.

    How the quantities and assumptions are developed

    Duct centerline lengths alone do not describe a complete mechanical scope. Vertical rises, branches, fittings and schedule-only accessories need separate entries. Identify supply, return, outside air and exhaust systems before measuring; combining them can obscure different material and insulation requirements.

    Compare equipment counts across floor plans, schedules and riser diagrams. Record discrepancies in a clarification log instead of filling gaps with an undocumented quantity. Keep net installed quantities separate from fabrication or purchasing allowances.

    Illustrative example

    Illustrative plan-to-schedule reconciliation

    Suppose M-101 shows a 20 LF main and three branches at 10 LF each. A schedule lists three supply outlets. These are different measurements; neither replaces the other.

    ReferenceQuantityReview action
    M-101 main20 LFKeep 24 × 12 inch main separate from smaller branches.
    M-101 branches30 LFRecord three runs at 10 LF each.
    Air-device schedule3 EACross-check each outlet on the plan.
    Branch connections3 EACount connection details separately from straight duct.

    The straight-run total is 50 LF. Fittings, supports, dampers, insulation and waste need their own specification and measurement basis. This is an educational example, not a client takeoff.

    Checks before you use the estimate

    • Calibrate each sheet from a stated dimension; a printed scale may change when a PDF is resized.
    • Keep straight runs, fittings and accessories as separate items; record schedule-only scope explicitly.
    • Reconcile duplicated equipment tags across plans and risers before counting them twice.
    • Issue an open-item register for unscaled drawings, unclear routing and missing specifications.
    Need estimating support for an upcoming HVAC bid?

    Most takeoff estimates typically run between $150 and $1,000, tied to project size and scope, with a typical turnaround of 24–48 hours.

    Request HVAC estimating quote

    Deliverables for contractor review

    Specify an editable quantity or cost schedule, drawing references, equipment tags and a scope clarification log. Marked-up drawings connect measured items to the source plans. A priced estimate should identify unit prices, labor hours, rate assumptions and allowances separately.

    Keep the estimate revision and drawing/addendum dates together. Review the illustrative schedules, document register and revision log for the format, and the estimating methodology for measurement, pricing and review steps.

    Inspect recorded mechanical quantities

    Open the real HVAC takeoff excerpts to inspect selected equipment, ductwork and insulation quantities with units and drawing references. The interactive workspace separates base quantities from recorded allowances and includes matched floor and roof drawing excerpts where available. These excerpts demonstrate selected mechanical output; they are not a complete priced bid or a case study for every specialist scope.

    Scope boundaries and exclusions

    Quantity-only work excludes material prices, installation labor costs and contractor markup unless added to the agreed scope. A drawing review does not replace coordination modeling, fabrication detailing or engineering design.

    From plans to a reviewable file

    1. Send the plans

      Include mechanical drawings, schedules, specifications, addenda, the project location, and the bid deadline.

    2. Confirm the quote

      Agree the systems to count, whether the file is quantities or a priced estimate, the fee, and the delivery date before work starts.

    3. Count the Division 23 scope

      Quantities are listed by system with units and drawing references. Open questions stay in a clarification log.

    4. Review before you bid

      Check the workbook and any agreed markups. Your company submits the proposal.

    Fee, delivery and revisions

    Send your project location, document set and bid deadline. Confirm quantities-only, priced estimating, proposal support or a separate calculation package. Agree the fee, deliverables and delivery date before work begins. When documents change, identify the previous and revised issues and confirm the affected scope.

    For most estimates the measuring fee is typically $150–$1,000 per estimate. It follows project size and scope, and those estimates are typically ready in 24–48 hours.

    Pricing lists what changes the fee: project size, the mechanical systems on the set, and plan quality. Sample estimates includes redacted Excel takeoffs and color-coded PDF markups.

    Reconcile HVAC equipment tags before pricing

    Keep an equipment register separate from duct and pipe measurements. Match each plan tag to its schedule row, level, location and drawing revision. A repeated tag on a plan, riser and detail can refer to one unit; those views should not automatically produce three equipment counts.

    For an illustrative revision, a floor originally shows RTU-1 and RTU-2. An addendum adds RTU-3 and changes RTU-2's schedule. The review records one added unit and one changed specification, rather than adding both schedule rows again. List the affected curbs, supports, controls, power connections and condensate scope as individual responsibility questions.

    Retain an unresolved-tag list when drawings disagree. Use quantities from the agreed issue for the base bid and show alternates separately. See the HVAC bid estimating scope when you also need a material and labor cost basis; submit the equipment schedules and current addenda with the quote form below.

    Plan your request

    • Project address and building type
    • Drawing and addendum dates
    • Systems and trade boundaries
    • Supplier quotes or contractor rates
    • Bid deadline and required format
    Request this scope

    Inspect real sample quantities →

    Common questions

    HVAC Takeoff Services: technical questions

    Does a takeoff include material and labor prices?

    Quantities-only work does not. A priced estimate adds identified material inputs, labor hours, hourly rates and agreed allowances. State which output you need when requesting a quote.

    Can you use our cost codes or purchasing template?

    Provide the template and required grouping with the drawing set. Agree the reporting structure before measurement so equipment tags, units and system totals can be carried into your workflow.

    Are fittings included in the duct length?

    A straight-run length should not silently stand for fittings. Elbows, transitions, taps, dampers and connections need separately stated counts, areas or documented allowances.

    How do you handle missing risers or unscaled plans?

    Identify the missing information in a clarification log. Preliminary quantities should state their assumptions; an unverified drawing scale should not be presented as an exact measurement.

    Can I request a takeoff without a full bid proposal?

    Yes. Specify quantities-only and list the systems, drawings and report format needed. Contractor pricing and the final proposal remain separate.

    How much does an estimate cost?

    Most estimates typically cost $150–$1,000 when the request is a quantity takeoff. Project size and scope decide where it lands. The fee pays for the measurement, not the installation.

    How fast?

    Most takeoff estimates are typically finished in 24–48 hours. Counting starts only after the quote names the delivery date.