What is the Atlanta base-building versus tenant split?
Speculative office buildings around Atlanta are bid in two passes. The core and shell pass buys air handlers or rooftop units, shafts, and main ducts to a floor box or a capped tap. The tenant pass buys VAV or fan-powered boxes, downstream duct, flex and diffusers. If your invitation includes both sets, keep two subtotals. If you only have the shell, stop at the cap and list tenant distribution as excluded.
Medical office buildings add exhaust and filtration that a law office does not. Exam-room exhaust, if drawn, is its own duct system. Do not bury it in the return-air total.
Sample Atlanta rows
| System | Unit | Pass |
|---|---|---|
| Floor VAV or fan-powered box | EA | Tenant, matched to the schedule. |
| Downstream duct and flex | LF | Tenant. Flex length only from a typical detail or a drawn run, not a rule of thumb you do not disclose. |
| Shaft riser to the floor | LF | Base building, from the riser. |
| School kitchen hood and makeup air | EA | School kitchen package, separate from classroom VAV. |
| Gym dehumidifier or dedicated unit, if scheduled | EA | Its own system. |
Schools and the rooms that are not typical
Classroom wings repeat, and a typical room detail is useful when the plans say it applies. Count the typical, then count the exceptions: the cafeteria, the kitchen, the stage, the labs. Those rooms change both equipment and exhaust. A single square-foot factor for the whole school will not survive a sheet-by-sheet review.
Humidity control, where the designer wants it, is a scheduled unit or coil. Record the tag. Do not add reheat to every VAV box because the climate is humid.
Package
Send core drawings, tenant drawings, schedules, and the specification section for controls. State who carries test and balance. If the bid is a school addition, send the phasing plan so the existing wing is not measured as new.