Remote estimating · Phoenix, AZ

Phoenix rooftop cooling and roof-duct takeoffs

Phoenix roofs carry more packaged units, longer roof duct, and more insulation specification than a mild-climate set. Count what is drawn. Do not add tons because the summer is hot.

Remote service coverage. This page represents no local branch office.

Why Phoenix roof plans need their own subtotal

In Phoenix the roof is the mechanical room. Packaged units sit in rows, supply and return ducts run across the roof, and then drop into the building. Interior plans show the drops and the diffusers. If you measure only the reflected ceiling plan, you miss the roof duct. If you measure only the roof, you miss the drops and the terminals.

Insulation is the specification that changes the price of that roof duct. Exterior duct wrap, thickness, and weather jacketing are not the same product as interior liner. Give them different rows and different units. Square feet of wrap and linear feet of duct are both legitimate, but the proposal must say which one you will deliver.

Sample Phoenix rows

ItemUnitRoof or interior
RTU, scheduled cooling tons and heat typeEARoof equipment. One curb per unit unless a common curb is drawn.
Exterior supply duct on the roofLF and insulation SF, both labeledRoof. Jacketing called out from the spec section.
Interior drop and branchLFInterior.
Diffuser or troffer, neck sizeEAInterior ceiling.
Makeup-air unit at a kitchen or warehouse doorEAIts own system, not part of the office RTU count.

Do not resize the unit

A common request is to “add capacity for Phoenix.” That is a design change. The estimating desk counts the unit on the schedule. If the schedule is blank, the equipment is an allowance with the allowance named, or it is excluded. A separate load-calculation quote can be requested; it is not included in a quantity takeoff.

Large roofs also create labor assumptions: distance from the crane pad, screen walls, and night sets. Those affect hours, not the number of curbs. Send the labor rate and say whether one crane mobilization covers the whole roof.

Package to send

Send the roof plan, mechanical floor plans, equipment schedule, insulation specification, and any kitchen or process drawings. Name the building. A campus with three roofs is three roof subtotals unless you want one combined bid with the buildings identified.

Common questions

Questions about HVAC estimating in Phoenix

How should Phoenix roof duct be measured?

Measure roof duct separately from interior duct. Apply the insulation thickness and jacketing the specification gives for exterior duct. Interior liner is a different row.

Does the estimator increase tonnage for Phoenix heat?

No. Scheduled capacity is the equipment quantity. Redesign is a load calculation, which is a different quote.

What about monsoon or dust covers?

Include hail or debris screens only when the schedule or details call for them. Otherwise exclude them.

Are crane days part of the takeoff?

A takeoff can count units that need setting. Crane time is a cost input you provide or an exclusion.

Project address, not a Phoenix office

Send the street address with the drawings. Labor rates, freight, access and the reviewing authority come from that job, not from the city name on this page.

Other names in Southwest

Browse service coverage →

Open a map of Phoenix, AZ

The map shows the city. It is not an office location, and it does not load inside this page.