Which Los Angeles scope is not a duct quantity?
Three packages get stapled together in LA invitations. The first is the air-side takeoff: equipment, duct, terminals, insulation. The second is energy documentation, often described loosely as Title 24. The third is seismic restraint of equipment and sometimes of duct and pipe. Only the first is produced by measuring the plans. The second is a calculation and form set. The third is a specified accessory or a deferred engineering design.
If the mechanical details show a restraint cable, an isolator, or a seismic curb, count what is drawn and cite the detail. If the spec says “restraint by the contractor’s engineer,” exclude the design fee or list it as an allowance. Do not hide a design fee inside sheet-metal pounds.
Sample Los Angeles rows
| Row | Unit | Package |
|---|---|---|
| Packaged unit with economizer, as scheduled | EA | Equipment takeoff. |
| Outdoor-air duct to the economizer | LF | Air-side quantity. |
| Seismic curb in lieu of a standard curb, if specified | EA | Accessory. Do not count both curbs. |
| Restraint detail at suspended fan-coil | EA or exclude design | Only when a detail gives a count or a spacing rule you can apply. |
| Energy form / acceptance test | excluded unless quoted | Not a measured material. |
Ventilation that is drawn, not assumed
Mild weather does not mean “no outside air.” Dedicated outdoor-air units, economizers and energy-recovery cores appear on many LA office and school sets. Count the device the schedule names. Do not add outdoor air to a split system that has none drawn.
Schools and labs add exhaust that offices do not: lab hoods, kiln exhaust, paint booths. Keep those fans and their duct material off the comfort-air subtotal. A galvanized pound total that includes stainless lab duct will not match the buy.
What to send
Send mechanical plans, structural roof framing if curb and restraint scope is in your bid, the mechanical specification, and any energy-form exhibit the client attached. Say whether you need quantities only. If the client expects Title 24 paperwork, that has to be its own line in the fee proposal before work starts.