Remote estimating · Chicago, IL

Chicago high-rise hydronic and heating-plant takeoffs

Chicago drawings usually carry a heating plant and vertical risers that a rooftop-unit suburb never shows. Freeze protection, steam or hot water, and the cooling plant are separate quantities.

Remote service coverage. This page represents no local branch office.

Why a Chicago riser diagram controls the pipe total

Floor plans show the branches. The riser diagram shows the vertical pipe that repeats through the shaft. Measure the riser from the diagram, using floor-to-floor height from the architectural sections when the mechanical sheet does not dimension it. If the height is missing, the riser length is an open item, not a guessed 12 feet.

Heating and cooling water share shafts and must not share a total. A 4-inch heating-water riser and a 4-inch chilled-water riser are two lengths, two insulation specs, and often two jacketing specs. Steam, when the building still has it, adds traps, drip legs and a different specification again.

Sample Chicago shaft rows

Riser or plant itemUnitSource to cite
Heating-water riser, 4 inch, floors 3–18LFRiser diagram plus floor-to-floor height.
Chilled-water riser, 6 inch, same floorsLFSeparate insulation thickness from the heating riser.
Floor takeoff fitting and shutoff valveEAOne per floor that the plan shows a branch, not one per floor automatically.
Rooftop air handler with preheat coilEAPreheat is a coil and a piping connection, not part of the fan count.
Heat trace on exposed cooling-coil piping, if specifiedLFQuote the specified wattage and the linear feet drawn, or exclude it.

Heating plant versus tenant floors

A downtown bid may include the basement boilers or only the tenant floor. Read the invitation. Boiler, pumps, breeching and flue are a plant package. A tenant fit-out that taps an existing riser is a valve, a coil and downstream duct. Bidding the boiler into a one-floor office fit-out is a scope error.

Winter work changes labor and temporary heat, which are cost items. The quantities of pipe and duct do not grow because the bid is in January. State temporary heat as included with a defined allowance or excluded.

What the Chicago package should contain

Send architectural sections (for floor height), mechanical risers, typical floor plans, equipment schedules, and the specification sections for hydronic piping, insulation and boilers. Identify whether steam is in this contract. If you want pricing, send dated equipment quotes and the labor rate that applies to this job, including any project labor agreement that is actually attached.

Common questions

Questions about HVAC estimating in Chicago

What is the first split on a Chicago high-rise?

Heating water or steam versus chilled water versus air distribution. Risers are measured by size and floor count from the riser diagram, then checked against the floor plans where branches leave the shaft.

How should freeze protection be estimated?

Only where the drawings or specifications show heat trace, glycol, or a specific coil-pump package. Name the source. Do not add heat trace to every roof pipe by default.

Does the takeoff include union wage rates?

No. If the project requires a specific wage, it has to be in the project documents or in the rate you send. The city name is not a wage determination.

Are existing steam mains remade as new?

No. Existing pipe that remains is tagged existing. New branches, new valves and drip points are counted where shown.

Project address, not a Chicago office

Send the street address with the drawings. Labor rates, freight, access and the reviewing authority come from that job, not from the city name on this page.