What part of a Boston campus is in this bid?
Read the limit of work before you open the sheet-metal scale. A building on a campus loop may include a steam-to-hot-water converter, pumps, and secondary piping, while the steam service stops at a drip set in the basement. Another bid is only a floor renovation that taps a riser already in the shaft. Those are different purchase orders. The drawings’ limit-of-work line is the boundary.
Lab buildings add exhaust that classroom buildings do not. Hoods, high-plume fans, and stainless duct are specified products. A pound of galvanized classroom duct does not describe them.
Sample Boston renovation rows
| Item | Unit | In this building’s bid? |
|---|---|---|
| Steam-to-hot-water converter, tag HX-1 | EA | Only if the basement plans include it. |
| New hot-water branch on the renovated floor | LF | Yes, from the new-work plan. |
| Existing riser remaining in the chase | note | Not a new-pipe length. |
| Fume hood and dedicated exhaust valve | EA | Lab package. |
| High-plume exhaust fan on the roof | EA | Lab package, with the specified stack height recorded, not redesigned. |
Chases and routes you cannot see
Masonry renovations often lack a clear route from the shaft to the room. If the plans do not draw the branch, the branch length is an open item or an allowance with the allowance named. Do not trace a route the architect did not approve and then present it as a measured quantity.
Occupied academic calendars create phasing. Summer-only access is a labor assumption. Quantities stay with the phase that draws them. A future lab fit-out shown as dashed is an alternate.
Documents and rates
Send limit-of-work plans, demolition, new work, lab schedules if any, and the campus specification for steam and hydronics. If pricing is required, send labor rates and say whether off-hours work is required by the calendar in the specifications. Permit filing and sealed design remain excluded unless you ask for them in the quote.