Remote estimating · Las Vegas, NV

Las Vegas hospitality tower and kitchen HVAC takeoffs

Las Vegas hospitality drawings split a guest-room tower from a podium of restaurants, casinos or convention rooms. Kitchen exhaust and makeup air are a third package. Bidding them as one hotel system understates the podium.

Remote service coverage. This page represents no local branch office.

Where do Las Vegas hotel quantities get blended by mistake?

The tower is repetitive. A typical guest-room plan can be counted by room type if the drawings give a matrix. The podium is not repetitive. A restaurant, a show kitchen, a ballroom and a casino floor each have air handlers, exhaust and sometimes smoke control that the guest-room typical does not contain. Blending them produces a number that purchasing cannot buy against.

The pairing rule in the podium is exhaust plus makeup. A type I hood without a makeup unit is an incomplete system. If the architectural kitchen set shows the hood and the mechanical set does not show makeup, log the gap. Do not invent a unit size.

Sample Las Vegas rows

PackageUnitRepeat rule
Guest-room fan-coil or PTAC, room type KEACount from the room matrix, not from one enlarged plan.
Corridor dedicated outdoor-air unit, towerEAOne per the schedule, serving the floors listed.
Ballroom air handlerEAPodium. Not a multiple of the guest-room unit.
Type I hood exhaust fan and ductEA / LFKitchen. Material and weld spec as written.
Makeup-air unit for that hoodEAPair to the hood. Scheduled CFM only.

Smoke control and special systems

Some assembly spaces include smoke exhaust or stair pressurization. Those fans and ducts are life-safety systems. Keep them out of the comfort-air pound total and out of the kitchen total. If your contract does not include them, exclude them by specification section.

Pool and spa dehumidifiers, where the amenity drawings show them, are high-latent units with special duct material. They are not guest-room fan-coils.

Cooling capacity stays on the schedule. A request to add tons for the desert is a redesign, not a takeoff revision.

What to send

Tower typicals, the room matrix, podium plans, kitchen equipment plans, and schedules for both tower and podium. Name the phase if the podium opens before the tower. Send labor rates and equipment quotes if you want a priced estimate rather than quantities. Crane and swing-stage assumptions for a tower roof should be stated by you or excluded.

Common questions

Questions about HVAC estimating in Las Vegas

How is a Las Vegas guest tower different from the podium?

Guest floors repeat a room typical: fan-coil or PTAC, bath exhaust, corridor outdoor air. The podium is custom air handlers, kitchens and large assembly spaces. Repeat the typical only where the plans say the floor repeats, then measure the podium room by room.

What must be paired in a restaurant?

Type I or Type II hood exhaust and the makeup-air unit that replaces it. Count both, with the scheduled CFM, or log one as missing.

Does desert heat increase the tons?

No. Use scheduled capacity. Resizing is a load calculation, quoted separately if you need it.

Are pool and spa systems in the hotel typical?

No. Natatorium dehumidification, when drawn, is its own equipment and duct system.

Project address, not a Las Vegas office

Send the street address with the drawings. Labor rates, freight, access and the reviewing authority come from that job, not from the city name on this page.

Other names in Southwest

Browse service coverage →

Open a map of Las Vegas, NV

The map shows the city. It is not an office location, and it does not load inside this page.