Which Miami rows exist because of humidity?
Outdoor air in a humid climate is equipment, not a note in the margin. Look for a dedicated outdoor-air unit, a reheat coil, or an energy-recovery ventilator on the schedule. Measure the outdoor-air duct from that unit to the point it mixes or delivers. Count the reheat coil and the pipe or electric feed the drawings show. Leaving reheat out understates both the equipment buy and the energy the air handler was selected around.
Kitchens and garages add another outdoor-air problem: makeup air equal to exhaust. The makeup unit, its duct, and the kitchen hood exhaust are a pair. Pricing the hood without the makeup unit is a coordination miss you should log if one of the two is missing from your scope.
Sample Miami rows
| Specified item | Unit | Material note |
|---|---|---|
| Dedicated outdoor-air unit with hot-gas or electric reheat | EA | Reheat type comes from the schedule, not from a default. |
| Coastal coil coating, if the schedule says coated | EA | An accessory to the unit, not a second unit. |
| Stainless dishwasher or lab exhaust duct | LF | Not mixed into galvanized supply pounds. |
| Aluminum or stainless louver at the exterior wall | EA | Often drawn on architectural elevations. Check both. |
| Makeup-air unit paired to kitchen exhaust | EA | State the CFM the schedule prints. Do not balance it by guess. |
Corrosion and wind are specification checks
Salt air shows up as a coating, a different fastener, or a different equipment housing. If the spec is silent, do not upgrade the basis-of-design unit on your own. Write “coating not specified” in the clarification log so the contractor can qualify the bid.
Wind and impact requirements may force a rated curb or an engineer. That cost is either a quoted rated curb or an exclusion for delegated design. It is not extra pounds of duct.
Send this set
Equipment schedules, outdoor-air diagrams, kitchen or garage sheets if they exist, insulation and material specifications, and the bid form. Say whether the building is occupied. Temporary dehumidification during construction is an allowance, not a measured permanent unit, unless the drawings show a temporary unit.