Seattle heat-recovery and ventilation takeoffs

Seattle mechanical sets spend their complexity on ventilation and heat recovery, not on huge cooling plants. Electric heat versus gas, and who owns the energy forms, need a decision before pricing.

Remote service coverage. This page represents no local branch office.

Why Seattle bids turn on ventilation equipment

Cooling loads are often modest. The drawings still show a lot of air: energy-recovery ventilators, dedicated outdoor-air units, and exhaust risers for bathrooms and labs. The takeoff should lead with those units and the two ducts that serve them, supply and exhaust. A contractor who only receives a cooling-ton list cannot buy the job.

Heat recovery has accessories that get missed: bypass dampers, frost control, filters, and the specified core type. Read the schedule notes. A wheel and a plate exchanger are different products. If the schedule allows both, list the basis of design and flag the alternate.

Sample Seattle rows

ItemUnitSystem
Energy-recovery ventilator, scheduled CFMEAVentilation plant.
Exhaust duct to the recovery unitLFExhaust metal, not supply.
Electric duct heater, kW as scheduledEAHeat. Record kW. Electrical connection is a responsibility note.
Gas furnace and flue, if that is what is drawnEA / LFDo not also count an electric heater for the same zone.
Roof curb and who flashes itEAMechanical curb versus roofing exclusion, written out.

Electric buildings and the flue that is not there

Many Seattle projects are all-electric. Do not add gas piping or a flue out of habit from another region. Other projects still use gas at a rooftop unit. The schedule decides. Mixed buildings can do both, and the subtotals should show it.

Energy-code documentation is frequently attached to the invitation in the Pacific Northwest. Treat it as its own fee. Measuring duct does not produce a compliance form.

Wet roofs

Curbs, overflow, and who cuts the roof are coordination items with the roofer. List the curb in the mechanical count if the mechanical contractor buys it, and exclude flashing if the roofing spec takes it. Rain does not add a waste factor you cannot explain. Any waste allowance is labeled as an allowance.

Send ventilation schedules, roof plans, and the specification section that assigns energy forms and commissioning. Say if the building is a lab; fume exhaust will change the material column.

Common questions

Questions about HVAC estimating in Seattle

What is the main Seattle quantity besides duct?

The energy-recovery or dedicated outdoor-air unit, the exhaust and supply duct connected to it, and the terminals. Cooling tons are often the smaller part of the equipment list.

How do you treat electric heat versus gas?

Whichever the schedule shows. Electric duct heaters are counted and their kW recorded. Gas furnaces bring a flue. Do not swap them.

Are Washington energy forms included?

Only when the quote includes a calculation package. A takeoff does not complete energy-code forms.

Do rain and roof leaks add sheet metal?

No. Roof curbs, flashing responsibility and sealant are scope notes. Extra metal is added only when it is drawn.

Project address, not a Seattle office

Send the street address with the drawings. Labor rates, freight, access and the reviewing authority come from that job, not from the city name on this page.