Why Seattle bids turn on ventilation equipment
Cooling loads are often modest. The drawings still show a lot of air: energy-recovery ventilators, dedicated outdoor-air units, and exhaust risers for bathrooms and labs. The takeoff should lead with those units and the two ducts that serve them, supply and exhaust. A contractor who only receives a cooling-ton list cannot buy the job.
Heat recovery has accessories that get missed: bypass dampers, frost control, filters, and the specified core type. Read the schedule notes. A wheel and a plate exchanger are different products. If the schedule allows both, list the basis of design and flag the alternate.
Sample Seattle rows
| Item | Unit | System |
|---|---|---|
| Energy-recovery ventilator, scheduled CFM | EA | Ventilation plant. |
| Exhaust duct to the recovery unit | LF | Exhaust metal, not supply. |
| Electric duct heater, kW as scheduled | EA | Heat. Record kW. Electrical connection is a responsibility note. |
| Gas furnace and flue, if that is what is drawn | EA / LF | Do not also count an electric heater for the same zone. |
| Roof curb and who flashes it | EA | Mechanical curb versus roofing exclusion, written out. |
Electric buildings and the flue that is not there
Many Seattle projects are all-electric. Do not add gas piping or a flue out of habit from another region. Other projects still use gas at a rooftop unit. The schedule decides. Mixed buildings can do both, and the subtotals should show it.
Energy-code documentation is frequently attached to the invitation in the Pacific Northwest. Treat it as its own fee. Measuring duct does not produce a compliance form.
Wet roofs
Curbs, overflow, and who cuts the roof are coordination items with the roofer. List the curb in the mechanical count if the mechanical contractor buys it, and exclude flashing if the roofing spec takes it. Rain does not add a waste factor you cannot explain. Any waste allowance is labeled as an allowance.
Send ventilation schedules, roof plans, and the specification section that assigns energy forms and commissioning. Say if the building is a lab; fume exhaust will change the material column.